LMWQCC - HV Asset Renewal

  • Client
    Icon Water
  • Timescale
    24 months
  • Location
    Holt, ACT
  • Industry
    Water Utilities
  • Service
    Civil, Communications, Critical Power, High Voltage, Low Voltage
  • Contract
    Head Contractor
  • Pillars
    Build & Commission

LOWER MOLONGLO WATER QUALIY CONTROL CENTRE

LMWQCC is the main wastewater treatment plant for the ACT and the largest inland treatment facility in Australia. Originally built in the 1970’s this important piece of infrastructure and its original power assets had come to the end of life.

Shepherd was engaged by Icon Water as Principal Contractor to renew the High Voltage Assets to a modern standard.

500

t of Precast Pits

4212

lengths of Conduit

12
km

of 630mm2 cable

59
k

manhours

The scope of the project included the installation of:

  • 3 x 11kv 1.5mVA Standby Generators
  • 2 x 11kv Main Switchrooms
  • 7 x Kiosk Substations
  • 6 x Ring Main Units &  Transformers
  • Earth Rings
  • New conduit and pit network
  • All Associated civil works

Constant Flow

Despite replacing every High Voltage Asset on the site through meticulous planning and detailed commissioning regime our team was able to complete the strategically staged shutdown program without any disruptions to the plants operations.

Through out the course of the project our team comprehensively managed on site Electrical, Civil, Structural and hydraulic requirements for the project to provide a package solution to our client.