Shepherd was appointed as the Electrical Contractor for the Department of Social Services building as delivered by a FDC/Richard Crookes Joint Venture.
62
k Working Hours
38
.4
km2 NLA
5
Green Star
4.5
+
Star Nabers Design
Scope of work
Power
- Main Switchboards
- House Distribution Boards
- Tenant Distribution Boards
- Mains and Sub Circuit cabling reticulation
- General Purpose Power
Critical Power
- Standby Emergency Generator Set
- Generator Controls
- Generator Fuel System
- Load Bank
- Load Management System (LMS) with BSN interface
- UPS (Uninterruptable Power Supply) with BSN interface
Lighting
- Installation of internal and external luminaires
- EXIT and Emergency lighting with BSN (Building Service Network) interface
- Lighting Control System (LCS) by a DALI digital lighting system with BSN interface
Other
- Lightning Protection System
- MATV (Master Antenna Television)
- DAS (Distributed Antenna System)
MAINTAIN
Shepherd has remained involved with delivering ongoing planned and reactive maintenance services to the building.
JOIN OUR TEAM TO SHAPE SIMILAR PROJECTS
Available positions are listed on our careers page.