Calvary Private Hospital

  • Client
    A.W Edwards
  • Timescale
    15 Months
  • Location
    Bruce, ACT
  • Industry
    Health
  • Service
    Civil, Communications, Critical Power, High Voltage, Lighting Control, Low Voltage
  • Pillars
    Build

Shepherd was engaged to provide a Design and Construct solutions for the Calvary Private Hospital.

118

beds

8

theatres

34
k

Work Hours

SCOPE OF WORKS

General Power

  • High Voltage coordination, design and installatiom
  • Main Switchboards and Distribution Boards incorporating multiple change over switches
  •  AS3003 compliant Cardiac Operating Theatres, ICU’s and General Wards
  • Power – Essential and Non-Essential
  • Lightning Protection

Critical Power

  • Generation Plant and controls
  • UPS system servicing Cardiac Theatres, ICU’s and General Wards

Lighting

  • General and Specialised luminaires
  • Dali Lighting Control system

Communications

  • Complete Security, Duress and Access Control
  • Communications network inclusive of all Racks
  • Wireless Access Points
  • Bespoke Nurse Call network
  • Master Clock system
  • Patient Information System

A DALI lighting control system with total coverage and control of all lighting in and around the Hospital was installed on the project, through multiple rigorous meetings with Hospital user groups that are to operate each area, a detailed functional lighting control design brief was created on a room by room basis to ensure the most efficient control of each light throughout the entire Hospital.

JOIN OUR TEAM TO SHAPE SIMILAR PROJECTS

Available positions are listed on our careers page.

Similar Projects

Willinga Park